Community Development DepartmentPermit Center

Permit Center Review Time Frames

Process times are for projects with approved entitlements.

Over the Counter
Residential Commercial / Industrial
  • Bathroom Remodel
  • Detached Accessory Structures <120 sf (Planning Review Only)
  • Fences <6 Feet (Planning Review Only)
  • Heating & Air Conditioning
  • Home Occupation Permit
  • Kitchen Remodel
  • Masonry Chimney Repairs
  • Minor Interior Remodel
  • New Gas Appliance
  • New lights, outlets, switches
  • Photovoltaic Systems under 10kW (limit two per customer)
  • Portable Package Spas
  • Repair Gas Line
  • Reroof
  • Service Panel Upgrade
  • Sewer Line Replacement
  • Siding or Stucco Applications
  • Skylight Installation
  • Solar systems - Pools
  • Voluntary Seismic Upgrade
  • Water Heater Replacement
  • Water Line Replacement
  • Water Repipe
  • Window Installation - New
  • Window Replacement
  • Irrigation Controller
  • Temporary Power Poles
1 Day Review 3 Day Review 5 Day Review
Residential Residential Residential
  • Chimney Liners
  • Decks
  • Fire Repair (limited in size)
  • Patio Covers/ Arbors
  • Pool or Spa in Ground
  • Major Remodel (Structural Calculations)
  • Photovoltaic Systems over 10kW
  • Revisions
  • Swimming Pool in Earthquake Zone
  • Truss Calculations
  • Accessory Structures
  • Addition
  • Detached Garage
  • Fences with Calculations
  • Flag Pole
  • Patio Enclosure
  • Retaining Wall with Calculations
  • Secondary Dwelling Unit
Commercial Commercial / Industrial Commercial / Industrial
  • Sign Monument Under 6' Feet
  • Signs Wall Mounted
  • Electrical
  • Heating & Air Condition. No Calculations
  • Industrial Machines <400 lbs.
  • Deferred Submittal Items
  • Exterior Work
  • Fences with Calculations
  • Flag Pole
  • Kitchen Hoods
  • Parking Lot Expansion
  • Retaining Wall with Calculations
  • Revisions
  • Sales Office in Garage
  • Sales Trailer
  • Signs Monument Over 6 Feet
  • Swimming Pools
  • Towers and Antennas
7 Day Review 15 Day Review 20 Day Review
Residential Residential Residential
  • Fire Sprinklers
  • Fire Alarm System
  • Truss Calculations for Tracts
  • Duplex
  • Single Family Residence
  • Tract Master Plan
  • Tract Plot Plans
  • Apartment Building
Commercial / Industrial Commercial / Industrial Commercial / Industrial
  • Above Ground Tanks
  • Canopies
  • Demising Wall
  • Fire Sprinklers
  • Fire Alarm System
  • Gasoline Dispenser
  • Generator (Natural Gas)
  • High Pile Storage no Hazmat
  • Heating & Air Condition w/ Calculations
  • Industrial Machines >400 lbs
  • Partitions
  • Pedestrian Bridge
  • Seismic Upgrade
  • Spray Booth
  • Tenant Improvement
  • Trash Enclosures
  • Truss Calculations
  • Underground Fire Service
  • Addition
  • Grading
  • Grading with Underground Utilities
  • Site Work
  • Hazardous Uses
  • Above Ground Tanks-Gasoline, Diesel, Corrosives
  • Clean Rooms
  • Generators (diesel, propane)
  • Hazardous Use Machines
  • Process Gas Systems
  • Racking with Hazmat
  • Underground Tanks
  • Commercial/Industrial
  • Hotel/Motel
  • New Commercial or Industrial Building